Contact:

Phone: 03 9794 5389
Fax: 03 9785 3575
Email: info@rollonrender.com.au
 

How to Use

Simply pour the render into the bucket of water and mix well, then dip your textured roller in to the render and apply to the highest part of the wall and let gravity do the rest. (If it doesn’t roll and adhere to the wall without pressure this indicates more water is needed to be added to the mix)

Repeat this 3 times and then gently go from left to right over the render with your roller.

Holding straight edge with your wrist as close as possible to the wall, screen from left to right, adding back the material to bucket, finish of all rendered part.

Then with plastic trowel, in smooth motion glide the trowel from top to bottom of render. Repeat process till finished.

Let dry for 24 hours and then wet down rendered wall. Wait another 24 hours wet wall down again before applying second coat of render. This coat is where you do your finished texture. We recommend lightly misting walls once a week till time of painting.